Tree Work on Fairfax Campus

Posted: February 19, 2021 at 1:07 pm, Last Updated: February 19, 2021 at 1:08 pm

Contractors will perform tree pruning on the Fairfax Campus from Monday, Feb. 22, through Friday, March 12. Work will occur Monday–Thursday from 8 a.m. to 4:30 p.m., with Fridays held as rain dates.

The majority of the work will take place along Patriot Circle, but other secondary roads/sidewalks/parking lot perimeters will also be included.

Safety precautions and traffic control measures will be in place.

For questions, contact Erich Miller at 703-993-9698 or emillerq@gmu.edu.

Write to University Information at building@gmu.edu

No Comments

Questions?

Do you have questions about construction or traffic impacts to Mason? Contact us at building@gmu.edu or call the Switchboard at 703-993-1000.

What’s the current traffic around Mason? Check out WTOP 103.5 FM or call 511 (free real-time traffic info through VDOT).

TodayAtMason on Twitter

Stay updated on campus construction, traffic information, and more! Follow the official Twitter feed for TodayAtMason.