Static Header Image for Building Patriot Pride

Latest Posts

Parking and Traffic Advisory, August 22

Posted: August 20, 2018 at 12:55 pm

Heavy traffic is expected on the Fairfax Campus on Wednesday, August 22, due to a large, all-day event at EagleBank Arena. The event begins at 8 a.m., with up to 6,000 in attendance. To avoid delays, Mason faculty, staff, and students are advised to avoid the Braddock Road entrances to campus and park in the Rappahannock […]

Finish Reading Parking and Traffic Advisory, August 22

Update: Parking Lot Closures

Posted: August 14, 2018 at 4:08 pm, Last Updated: August 14, 2018 at 4:09 pm

Work crews will perform maintenance on select parking lots on the Fairfax Campus from Tuesday, August 14 through Sunday, August 19, from 6 a.m. to 6 p.m. each day (weather permitting). Some dates have been adjusted due to weather impacts. These lots will need to be vacated and temporarily closed on the following dates: Lot R: […]

Finish Reading Update: Parking Lot Closures

Asbestos Abatement – Robinson A

Posted: August 8, 2018 at 9:18 am, Last Updated: August 8, 2018 at 9:21 am

On August 9–10, the asbestos abatement process will begin in Robinson Hall A, with an anticipated completion date of early September. All asbestos materials will be removed by a licensed abatement contractor using mandatory work practices designed to prevent the release of asbestos fibers. All waste material from the abatement will be secured in sealed […]

Finish Reading Asbestos Abatement – Robinson A

Tree Removal – Robinson A

Posted: August 8, 2018 at 9:13 am

Starting Wednesday, August 8, work crews will be on site at the north and east sides of Robinson A for tree removal. Safety precautions will be in place at the work site. Those in nearby buildings may expect noise related to this work. Lumber from some of the trees being removed is planned to be used for benches inside the new academic building. […]

Finish Reading Tree Removal – Robinson A

Road and Parking Lot Paving

Posted: July 26, 2018 at 2:22 pm

Work crews on the Fairfax Campus will mill and pave select roads and parking lots from July 27 to August 1, from 6 a.m. to 7 p.m. each day. Safety precautions will be in place and flag people will be directing traffic. Affected areas include: Lot C Lot I (drive lanes close to White Top […]

Finish Reading Road and Parking Lot Paving

Questions?

Do you have questions about construction or pending traffic impacts to Mason?
building@gmu.edu
Then just ask!

What's the current traffic around Mason? Check out WTOP 103.5 FM or call 511 (free real-time traffic info through VDOT)

Mason Twitter News