General Advisories

Chilled Water Outage in SUB I: May 21–24

Posted: May 20, 2021 at 12:37 pm

A chilled water shutdown will be in effect in SUB I from Friday, May 21, at 5 p.m. until Monday, May 24, at 10 a.m. The shutdown will affect the air conditioning. Building occupants will notice warmer temperatures inside the building during this time. For questions, contact Cathy Pinskey at cwolfe4@gmu.edu.

Tree Work on Fairfax Campus

Posted: February 19, 2021 at 1:07 pm, Last Updated: February 19, 2021 at 1:08 pm

Contractors will perform tree pruning on the Fairfax Campus from Monday, Feb. 22, through Friday, March 12. Work will occur Monday–Thursday from 8 a.m. to 4:30 p.m., with Fridays held as rain dates. The majority of the work will take place along Patriot Circle, but other secondary roads/sidewalks/parking lot perimeters will also be included. Safety […]

Tree Work: Fairfax Campus and Off-Campus Locations

Posted: October 9, 2020 at 1:43 pm, Last Updated: October 9, 2020 at 1:44 pm

JL Tree Service will perform tree pruning/removal at the following locations on dates listed below: Tallwood Annex: Wednesday, Oct. 14 Fairfax Campus (rolling): Thursday, Oct. 15, through Saturday, Oct. 17 Mathy House site: Monday, Oct. 19, and Tuesday, Oct. 20 Point of View: Wednesday, Oct. 21, and Thursday, Oct. 22 Work will occur between 8:30 […]

Tree Work on the Fairfax Campus: Jan. 14–19

Posted: January 14, 2020 at 2:01 pm

Contractors are on the Fairfax Campus from Tuesday, Jan. 14, through Sunday, Jan. 19, to prune and remove hazardous trees. Work will occur from 8 a.m. to 6 p.m. Sidewalks or roads may be temporarily blocked in the following areas while work occurs: Krug Hall Lecture Hall Merten Hall The MIX Nguyen Engineering Building Shenandoah […]

Chilled Water and Air Conditioning Outage: October 11–14

Posted: September 19, 2019 at 4:20 pm

The chilled water supply will be shut down in several buildings from Friday, October 11, at 4 p.m. until Monday, October 14, at noon to facilitate utility upgrades for the Core Campus Project. There will be no air conditioning in these buildings: The Commons The Hub Southside Skyline The chilled water supply also will be […]